Quantcast
Channel: Biliran Blogs
Viewing all articles
Browse latest Browse all 987

DE ADONGAY INSPECTS INFRASTRUCTURE PROJECTS AT MARIPIPI ISLAND

$
0
0
Engr. David P. Adongay Jr., (wearing hat) District Engineer of Biliran District Engineering Office (BDEO) visits on-going Replacement of Banlas Bridge (B00061BR) along Maripipi Circumferential Road on April 28, 2017. The said project is implemented by Biliran DEO under 2016 General Appropriations Act (GAA) with an accomplishment of 80% as of April 30, 2017. Upon Adongay’s inspection, the project is on-going with installation of forms and scaffolding for girder and slab of the bridge.

NAVAL, Biliran, (DPWH-BDEO) – Engr. David P. Adongay Jr., District Engineer of the Department of Public Works and Highways (DPWH) – Biliran District Engineering Office (BDEO) takes time to conduct a round-up inspection of Biliran DEO Infrastructure Projects at Maripipi Island, Biliran on April 28, 2017.

The Municipality of Maripipi is separated by a narrow channel from the island of Biliran and can be reached by a small boat for about 1.5 hours of travel from Naval, the capital town of Biliran province.  It is an island-municipality with a coastal circumference of twenty-four kilometers.

The first project inspected by Engr. Adongay, Jr. is the Rehabilitation/ Reconstruction of Maripipi Circumferential Road. This project is under the implementation of Regional Office 8 with the amount of P135M funded under 2016 General Appropriation Act (GAA). As of April, 2017, it has an accomplishment of 21.08%. The project was started late due to late completion of Preliminary & Detailed Engineering activities. The completed project will provide a standard concrete paved road for the safe and faster transport of goods and services to the capital barangay of the municipality.

Another project inspected by Adongay, Jr. is the on-going Replacement of Banlas Bridge (B00061BR) along Maripipi Circumferential Road. This is a 2016-Carry-over project of Biliran DEO costing 8.7M. Upon Adongay’s inspection, the project is on-going with installation of forms and scaffolding for girder and slab of the bridge with an accomplishment of 80% as of April 30, 2017. Adongay, Jr. said that this project is target to be completed on or before July, 2017. The completed Bridge will provide a standard Bridge (with two lanes) in replacement of the old one which is sub-standard (with one lane only) thereby providing safe passage to the travelling public.

Adongay, Jr. also inspected the just started construction of 2-storey, 8-classroom School Building at Maripipi National Vocational School, Maripipi, Biliran under General Appropriation Act (GAA) of 2016, Batch 13. The project is on-going with the installation of forms and scaffolding for the 1st floor of the building with an accomplishment of 10%. This project has a contract cost of P11.875M under contract with BNL Construction. It is scheduled to be completed on September 23, 2017. Completion of the project will provide additional classrooms for the school hence offering a place conducive to learning for the students. The additional classrooms will accommodate more or less 320 students.

The post DE ADONGAY INSPECTS INFRASTRUCTURE PROJECTS AT MARIPIPI ISLAND appeared first on Biliran Blogs.


Viewing all articles
Browse latest Browse all 987

Trending Articles